APPLICATIONS~PERMITS~LICENSES
Page Navigation

Department: Zoning Permit~Code Enforcement~Rental Inspection
Go To Section

Close
- Zoning Permit~Code Enforcement~Rental Inspection
- Jump to: Zoning Permit~Code Enforcement~Rental Inspection - Rental Property
- Jump to: Zoning Permit~Code Enforcement~Rental Inspection - Maps
- Jump to: Zoning Permit~Code Enforcement~Rental Inspection - Vacant Property
- Jump to: Zoning Permit~Code Enforcement~Rental Inspection - Zoning Compliance Permit & Review
- Jump to: Zoning Permit~Code Enforcement~Rental Inspection - Zoning Permits
-
- Landlord Certification In lieu of Zoning Officer physical inspection due to Covid-19 Emergency. Expires 12/31/21.
- Landlord/Tenant Rental Registration & Rental Inspection The mandatory Landlord/Tenant Registration & Inspection Form must be renewed annually or in the event of a change of Tenant.
- Rental Certificate of Habitability The Landlord/Tenant Registration and Rental Inspection must be completed prior to issuance of the Certificate of Habitability.
Please fill out all information requested on each application. Properly completed applications save processing time. - Landlord Certification
-
- Mendham Borough Zoning Map
- Street and House Number Map
Please use for reference only. -
- Vacant Property Registration Statement This Application/Statement is to be completed for any vacant property located within the Borough.
- Vacant Property Registration Statement
-
- Zoning Compliance Permit & Review A Zoning Compliance Permit & Review is required to be completed for all Joint Land Use Board (JLUB), Historic Preservation Commission (HPC) and Construction Permit Applications. Including Sheds, Additions, A/C Unit Replacements, Whole House Generators, Patios, etc.... After review by the Zoning Officer, a Zoning Compliance Permit is issued to the applicant which must be included with the Construction Permit Application, JLUB or HPC Application. For Variance request please use the next form Zoning Compliance Review & Permit Application- JLUB Variance. Whole House Generators: All generator applications require a scalable survey showing the placement of the generator to scale (outside the setbacks). A Zoning Compliance Permit & Review is required to be completed for all Joint Land Use Board (JLUB), Historic Preservation Commission (HPC) if needed and Construction Permit Applications. After review and approval by the Zoning Officer, a Zoning Compliance Permit is issued.
- Zoning Compliance Permit & Review - JLUB Variance A Zoning Compliance Permit & Review is required to be completed and submitted with all Joint Land Use Board Variance Applications.
- Zoning Compliance Permit & Review
-
- Fence Non-Pool, Wall, Gateway & Entrance Pillars All Zoning Permits for Non-Pool Fence, Wall, Gateway & Entrance Pillars are issued by the Zoning Office --NOT the Construction Department. Applications require submission of a picture of the fence and a survey indicating the placement of the fence and dimensions. Fences on Lot Road Frontage Maximum Height is 4’ and 6’ behind the front foundation. All Pool Fence Permits are issued by the Construction Department per NJ State Building Code.
- Flag Pole
- Outdoor Dinning
- Roll Off Container/Dumpster
- Temporary Sign
- Temporary Storage Container All containers (PODS) require a permit. - See Sub section 215-7 of the Borough ordinance
- Fence Non-Pool, Wall, Gateway & Entrance Pillars